03 / Data migration
Migrate data.
Transition between systems.
Transfer business data into a new application or database in a controlled way. We analyze the source, define the target model, test the transfer and validate the result before cutover.
Back up the source.
source: legacy
checkpoint: snapshot_01
Mapping and validation run.
count(source) == count(target)
Perform a controlled cutover.
Acceptance criteria and rollback procedures are defined before the transition.
Starting point
Copying records is not a complete migration.
Fields, relationships and business rules differ between systems. Historical data may contain duplicates or missing values. We make these differences visible so that cleansing and retention decisions can be made deliberately.
Applications
A system transition with a controlled handover.
Replace applications
Transfer customer, product and business data into a new ERP, CRM or business system using documented mapping rules.
Consolidate datasets
Bring related data into a shared model. Relationships are preserved and conflicting IDs are handled transparently.
Transfer historical data
Determine which data moves, which remains archived and how it will remain accessible after the legacy system is retired.
Project scope
Trial run.
Acceptance. Cutover.
Scope depends on your systems and the desired outcome. We agree on these points with you.
The transition is tested in advance.
Data volume, ongoing changes and technical constraints determine the cutover. A trial run and an agreed rollback point precede the production transition. A transition without downtime requires an assessment of both systems.
- Analysis of record counts, key relationships and data quality
- Agreed rules for mapping, cleansing and exclusions
- Repeatable migration procedure with test data and a trial run
- Validation of record counts, totals and key relationships
- Cutover plan with a freeze window or delta transfer, plus rollback
- Reconciliation report and documented exceptions
Service scope and responsibilities are agreed for each project. Our approach: acceptance and operations
Technical questions
Acceptance and rollback procedures.
How do you verify migration completeness?
Can data be cleaned during migration?
Do operations need to pause during cutover?
Can we return to the old system?
Your next connection
What should your systems
achieve together?
You bring the requirements. We clarify the connections.
Practical integration challenges
Technical topics in this area.
Automate CSV imports
The file arrives every day. Someone corrects columns, uploads it and then checks error messages. DataSource turns this recurring task into a documented import with clear rules for incomplete and invalid data.
Legacy systems & middleware
The legacy system serves its purpose but does not offer the same interfaces as a new application. We examine existing access options and develop narrowly scoped middleware to bridge the differences in a controlled way.
Connect SQL databases
Reporting, portals or business applications need data from another database. We plan a connection that accounts for access rights, consistent data states and the rules of the applications involved.